Skip to Content

Virtual Design & Construction

VDC That
Drives
Delivery.

CCAD's VDC services go beyond model production. We provide VDC leadership — establishing the digital framework that connects design, coordination, schedule, and field execution into a single, managed process. From BIM Execution Planning through digital twin handoff, we own the outcome.

BIM is the Tool.
VDC is the Strategy.

Most projects have BIM. Few have VDC. The difference is governance — a managed process that connects the model to real construction decisions, enforces standards across every contributor, and ensures the digital environment stays aligned with what's actually being built.

CCAD provides that governance. We don't just coordinate models — we lead the digital delivery of the project, from the first BEP through the final as-built handoff.

Discuss Your Project
What VDC Leadership Delivers
Fewer RFIs. Tighter schedules. Higher prefab readiness. Cleaner closeout. A model worth owning after construction ends.
Who We Work With
General contractors, owners, developers, and trade partners across multifamily, hospitality, advanced manufacturing, semiconductor, infrastructure, and mission-critical sectors.
When to Bring CCAD In
Preconstruction is ideal — but we've stepped into active coordination mid-project and recovered it. The earlier, the more value we deliver.
01
BIM Execution Planning

We develop project-specific BIM Execution Plans (BEPs) that define model requirements, coordination workflows, software standards, and deliverable milestones — giving every stakeholder a clear framework before the first model file opens.

02
Digital Delivery Strategy

End-to-end digital delivery planning that connects the BIM environment to project controls, schedule, and owner handoff requirements. We structure the digital delivery environment so data flows through the project lifecycle without gaps.

03
Model Governance

Establishing and enforcing BIM standards across all project contributors — from model setup and naming conventions to LOD requirements and clash tolerance thresholds. We ensure model quality before it reaches coordination.

04
Trade Coordination Management

CCAD runs the coordination process — scheduling and facilitating ICDs, managing trade model submissions, enforcing coordination standards, tracking issue resolution, and maintaining the federated model. We own the room.

05
Prefabrication Support

Coordination models built to prefabrication tolerances and spool-ready standards. We work directly with fabricators to ensure the model supports shop drawings, reduce rework between coordination and fab, and maximize off-site assembly.

06
4D Scheduling & Sequencing

Linking the BIM model to the project schedule using Synchro 4D — creating visual construction sequences that identify logistical conflicts, improve phasing decisions, and give the project team a shared understanding of how the job runs.

07
Digital Twin Readiness

Every CCAD-coordinated model is built to as-built-quality standards from day one — making the transition to a digital twin a natural outcome of the coordination process, not a separate effort at closeout.

08
Construction Technology Implementation

Evaluating, selecting, and implementing the right technology stack for your project or organization — from Revizto and Procore to Autodesk Construction Cloud and Newforma Konekt. We configure, train, and support adoption.

The Platforms We Deploy.

Platform-agnostic — we recommend what's right for your project, not what generates commissions

Autodesk Revit
Autodesk Revit
Navisworks
Navisworks
ACC
ACC
Procore
Procore
Revizto
Revizto
Synchro 4D
Synchro 4D
Newforma Konekt
Newforma Konekt
Matterport
Matterport
Leica
Leica
FARO
FARO
Bluebeam
Bluebeam

Ready to Get Started?

Let's Talk About
Your Project.

Bring CCAD in early. The earlier we're at the table, the more value we deliver — and the more rework we prevent.

Start a Conversation