Skip to Content

MEPF Coordination

Coordinated to Build.
Not Just to Model.

CCAD delivers full mechanical, electrical, plumbing, and fire protection coordination — produced to construction-document quality, reviewed for constructability, and built to prefabrication standards. Every system we touch is field-validated before the ICD is signed.

Coordinated to
Field Standards.
Not Design Intent.

Most MEPF coordination stops at clash detection. CCAD starts there and goes further — reviewing every system for constructability, sequencing, access, and prefabrication readiness before a single ICD is signed.

The difference between a model that looks coordinated and one that actually builds comes down to the questions asked during coordination. We ask the ones your field crew would ask.

Discuss Your Project
What We Coordinate
Mechanical, electrical, plumbing, and fire protection — all four trades in a single federated environment. No gaps between disciplines, no finger-pointing between subcontractors.
Our Standard
Every system is reviewed for constructability before the ICD is signed. Can it be hung? Can it be reached? Does the sequence work? If the answer is no, it doesn't leave our desk.
Fabrication Ready
Models delivered to fabrication tolerances — spool packages, duct sections, and electrical assemblies ready for shop drawing production without rework.
01
Mechanical Coordination

Full HVAC system coordination — ductwork routing, equipment clearances, access requirements, and installation sequencing. We model to fabrication-ready tolerances, not just clash-avoidance geometry.

02
Electrical Coordination

Power, lighting, and low-voltage systems coordinated in the federated model — conduit routing, panel clearances, tray routing, and junction box locations resolved before any conduit is pulled.

03
Plumbing Coordination

Domestic and process plumbing coordination — pipe routing, slope requirements, clean-out access, and connection sequencing coordinated with structural, mechanical, and electrical to eliminate the field conflicts that drain schedules.

04
Fire Protection Coordination

Sprinkler system layout and coordination — head locations, drop routing, bracing, and seismic splay coordinated with ceiling systems, mechanical, and structural. We model to NFPA standards with installation sequencing built in.

05
Trade Coordination Management

CCAD runs the coordination process end-to-end — scheduling ICDs, managing trade model submissions, enforcing clash tolerance standards, tracking issue resolution through Revizto, and maintaining the federated model. We own the room so your PM doesn't have to.

06
Clash Detection & Resolution

Systematic clash detection using Navisworks — but reviewed with a builder's eye, not just a software filter. We categorize, prioritize, and resolve clashes based on field impact and installation sequence, not just geometric overlap.

07
Prefabrication & Spool Packages

Coordination models built to prefabrication tolerances — spool-ready pipe packages, duct sections, and electrical assemblies that go directly to the fabricator without rework between coordination and shop drawings.

08
Construction Issue Documentation

Full ICD documentation, coordination meeting minutes, model revision logs, and issue tracking through Revizto — creating a defensible record of every coordination decision made on the project.

Autodesk Revit
Autodesk Revit
Navisworks
Navisworks
Revizto
Revizto
ACC
ACC
Bluebeam
Bluebeam
Synchro 4D
Synchro 4D

Ready to Get Started?

Let's Talk About
Your Project.

Bring CCAD in early. The earlier we're at the table, the more value we deliver — and the more rework we prevent.

Start a Conversation